Where does Building Swell fit with your ERP?

Building Swell
The Building Swell team
Planning

Your ERP helps track material, purchasing and costs against the job. But when the field asks what will be ready Friday, someone still has to check the shop schedule, find the drawing and ask the foreman where the work stands.

That information may be in a spreadsheet, on a whiteboard or in someone’s head. Keeping the financial records current does not necessarily give the crew a plan for tomorrow.

Building Swell gives your team a place to plan and follow that shop work. Start with what the shop needs to run production, then agree what information needs to pass between it and your ERP.

A worker records progress on a clipboard beside a timber wall panel on a fabrication table.

Give the shop a plan it can use

A project number connects purchases and costs to a job. The shop needs to break that job into work it can build.

What assemblies are required? Which drawings apply? What needs to go first? Who is doing the work, and what is holding it up?

Your team may already answer those questions in Excel or Smartsheet. The effort comes from keeping the answers current as requests change and several projects compete for the same people.

In Building Swell, you can organize that work into orders with quantities, production stages and due dates. Keep the drawings and discussion with the work, then use recorded progress to follow what is happening on the floor.

Follow the production packages

Consider this scenario. One project needs two packages of overhead racks. The first is required Friday. The second is needed the following Monday.

Purchasing has ordered material against the project. Costs are being recorded under its job number. The shop is managing the two packages in a separate tracker.

The first package has approved drawings and material ready. The second is waiting on a revised detail.

The shop needs to schedule the first package and keep the second on hold. A material purchase against the project does not establish that both packages are ready to build.

In Building Swell, the team keeps the packages distinct under the same project reference. Each has its own quantity, route and due date. The unresolved drawing and the person following up stay with the held work.

As the crew records progress on the first package, the project team can check its status. The second package still needs a drawing and a review of the remaining work before the shop can support its delivery date.

The ERP can continue handling the purchasing and financial records. The shop now has a production record for each delivery it is working toward.

Connect the information your team needs

You do not need to recreate every ERP record to improve the shop plan.

Decide what the planner needs from purchasing or inventory, and what the office needs back from production. That might include material availability, completed quantities or labor information for job costing. The scope depends on how your team works.

Then confirm the transfer method for those records. Check what is available today, what needs configuration and what someone will still update manually. Use matching job references so the office can relate the shop’s work to its financial records.

Some teams already manage more production detail in their ERP. Include that in the review. The goal is a usable shop plan with clear responsibilities for maintaining it.

See how it works

Bring your shop schedule and an example of what your ERP tracks for the same job. We’ll walk through how Building Swell can support production and what information needs to move between the two.

Book a demo