Field requests
Use Field Requests to share a project-specific form by link or QR code. Bring the scope, requested date and supporting information together for the people reviewing the work.
The request goes through review before production. Resolve missing details with the shop before treating the request as an agreed delivery commitment.
Plan packages around installation
One scope can contain work the field needs at different times. A platform and its stairs may belong to the same order without belonging on the same delivery.
Break the work into packages that match the installation sequence. Give each its required date so design and fabrication can plan toward the next usable delivery.
See what needs your attention
Follow your submissions in My requests. Review status and production progress are shown separately, so you can distinguish a request awaiting a decision from approved work moving through the shop.
Keep open questions with the affected package. You can go into the next conversation knowing whether the issue is a review, unfinished detailing or a required check after fabrication.
Recheck the plan when the field changes
Consider this scenario. The installation sequence changes and the field needs one package ahead of another.
Review the affected design work, materials and production bookings with the shop. Agree which package can move and carry that sequence back to the field team. If the supported plan still misses a required date, keep the shortfall visible so the project team can address it.
Walk through a field request
Bring a field request and the installation it needs to support. We can walk through submission, review and the handoff to fabrication in Building Swell.