Plan Facades from Frame to Field

Coordinate frame fabrication, glazing and checks around each package’s required delivery date. Keep the shop working on the units the installation team needs next.

Book Demo

Plan each facade package

Keep the installation area and required assemblies with the production package. Represent the fabrication stages and checks your shop runs, alongside the drawings and other inputs that can hold up the start.

  • The units required for the next installation area
  • Drawing or material holds that prevent work from starting
  • The shared stations and crews needed to change the sequence

Compare a change in sequence

The field moves one elevation ahead of another. The revised package needs a shop station that is already working on the original priority.

For this example, the project team chooses the revised elevation priority after reviewing the affected packages. The planner puts that sequence into the shop assignments and keeps the displaced package's required field date visible.

The crew works on the chosen priority. The project team receives the affected commitment to resolve, while any material hold remains attached to the work until that input is actually available.

Check progress before delivery

A completed fabrication stage is one part of the handoff. Keep the checks and any remaining work visible so the team discussing delivery is working from the package's actual status.

Complete pre-glazed facade unit with mounting brackets.

Bring an installation change

Bring an installation area, its required assemblies and a change in sequence. We can work through the effect on your shop plan.